The complete wind turbine is like a plug and play concept and with basic training a professional mechanic can assembly the wind turbine. To be able to do this they need a strong person/ part lift, and maybe a crane to move the parts to the required height. The installation time and costs are much lower due to the work that is done by local qualified persons. No need for very big cranes and expensive specialists like the situation with big wind turbines.